on the opposite side of the wall,
one can add as many drill as frame,
once the first phase (first frame)is locked in...
creating more stability....
or, the merging part on both sides
should be spiral drill and some surface area
but one wall has empty 'net' (hollow areas) in it.
for the earth to go through and keep the weigh of the ship
at bay.
i don't know, i'll leave it to the simulations.
if stuck let me know later.
i need to focus on other stuff......
i guess as i was trying to write prior,
making the wall into a "net" with the exception of
the merging part near the drills,
may allow the earth to descend down and support the ship,
hence not crushing the drill + welding machine.
until it is lifted again. but please calculate/simulate.
one way or another that ship will rise again......